Next race Thursday March 20th at 6PM and Thurman Bridge Closure.

MGP racers.   Next race is March 20th at 6pm.  We will run the normal course in this race but have changes for the Summer Solstice run.

On April 1st the Thurman Bridge and stairs will be closed for 6 to 9 months.    Read about it here.  https://www.portlandoregon.gov/transportation/62733

There will be a detour.    We can still access Lower Macleay trail via Upshur but longer detour on the way back.  https://www.portlandoregon.gov/transportation/article/456295   There is pedestrian access via Vaughn on the way back.   If you take the Vaughn pedestrian route, the course will be 0.17 miles longer or 6.93 total.   I went and wheeled the detour distance the other weekend.